EXAMPLES

Hospital

Case study at a private hospital [Medical examination changing room]

Ensuring patient safety

Proseven seismic brackets have been installed in the changing room of the medical examination center to improve earthquake preparedness.

Equipment: :Steel locker

Seismic brackets: KPS5-1

Fixing method: These lockers have been seismically fixed with “Anti Tip Metal Brackets with Gel Pads for Furniture” using the wall and the top plate of the lockers. These brackets can be installed without lifting or moving the lockers. The transparent films are stuck on the wall to reinforce the wallpaper.

lockers

Equipment: Steel rack

Seismic brackets: KPS5-1

Fixing method: This rack has been seismically fixed with “Anti Tip Metal Brackets with Gel Pads for Furniture” using the wall and the top plate of the rack. These brackets can be installed without lifting or moving the rack. The transparent films are stuck on the wall to reinforce the wallpaper.

steel rack

★Customer's voice

The medical examination changing room does not allow staff to enter. In the event of an earthquake during an examinee's changing, measures have been taken to protect against dangerous objects.