EXAMPLES

HospitalOffice

Case study at a private hospital [Changing room for staff]

No employee will be left behind, no matter the circumstances

Proseven Seismic Brackets Installed in Dressing Room for Earthquake Protection.

Equipment: :Steel locker (installed near the wall)

Seismic brackets: KPS5-1

Fixing method: These lockers have been seismically fixed with “Anti Tip Metal Brackets with Gel Pads for Furniture” using the top plate of the lockers and the wall. These brackets can be installed without lifting or moving the lockers. The transparent films are stuck on the wall to reinforce the wallpaper.

Equipment: Steel locker (installed in the center)

Seismic brackets: PSD Type

Fixing method: The lockers in the center of the changing room were not able to be fixed to the wall, so they were seismically fixed to the floor and the bottom of the front of the lockers using the “PSD series”.

Equipment: Steel locker (installed in the center)

Seismic brackets: KPS5-1 (customized type)

Fixing method: The island lockers were seismically fixed to the floor using the “PSD series” and connected to each other at the top using “cabinet seismic brackets” to integrate multiple lockers and improve seismic performance.

★Customer's voice

The changing room is a dangerous place, with many lockers lined up on both sides creating a sense of oppression. Furthermore, there are often few people around when changing, so it is a dangerous place if an earthquake occurs while someone is changing alone and the lockers all fall over. Additionally, if there are no people around, there is a possibility that the person will be left unattended. However, with this construction, there is no longer any need to worry about this, and it has become a safe place.